• Air Handling Systems Galvanized Frame Fan Filter Unit
  • Air Handling Systems Galvanized Frame Fan Filter Unit
  • Air Handling Systems Galvanized Frame Fan Filter Unit
  • Air Handling Systems Galvanized Frame Fan Filter Unit
  • Air Handling Systems Galvanized Frame Fan Filter Unit

Air Handling Systems Galvanized Frame Fan Filter Unit

After-sales Service: Foc Spare Parts
Type: Air Handling Unit
Corrosion Durability: Ultrahigh
Operating Voltage: 380/400 VAC
Noise Level: Ultra Low
Application Fields: Medicine
Customization:

360° Virtual Tour

Diamond Member Since 2021

Suppliers with verified business licenses

Manufacturer/Factory
  • Overview
  • Product Description
  • Product Parameters
  • Company Profile
  • Warranty&Payment
  • Warranty
  • After Sales Service
  • Promotion Method
  • FAQ
Overview

Basic Info.

Mounting
Ceiling Mount
Certification
ISO, CE, CCC
Condition
New
Frame
Non-Cold Bridge Aluminum Alloy
Panel Material
Single/Double Skin with Polyurethane Fitting
OEM/ODM
Avaiable
Tailor Made
Avaiable
Refrigerant
Water
Coil
4rows/6rows/8rows
Function Part
Assemble as Required
Air Volume
1000-15000 M³/H
Drain Pipe
DN25-40
Feature 1
Low-Noise
Feature 2
High Strength;High Reliability
Transport Package
Wooden Base with Plastic Bag
Specification
High quality motors& fans
Trademark
Ruidong or OEM
Origin
China, Shandong
HS Code
8418692090
Production Capacity
3000 Unit Per Month

Product Description

Please Note!!!  
We can customize different kinds of chillers and central air conditioners according to customer request. Welcome to contact us for details, we will provide professional solutions for you.

Product Description

1. Air handling unit and air handler features
1) AHU case is the high-strength aluminum alloy frame, with built-in insulation materials, no cold bridges.
2) The aluminum material surface treated by anodizing looks nice and corrosion-resistant. The panel is 25mm thick and of double skin structure. Both the inner and outer panel plates are made of quality Korean galvanized steel painted, beautiful and fashionable design
3) The sandwiched PU foam insulation material between the plates ensure the best performance of insulation, intensity, rigidity, cleanliness and noise insulation for the AHU, and ensure no condensed water on the surface
4) In the gap between the frame and the panel moisture-proof material has been used to seal up, avoid air leakage and energy loss
5) The base frame is hot-dip galvanized steel, Anti-corrosive


2. Air handler,air handling unit, ahu application
Eurostars air handlers widely used in stadium, exhibition centers, airport, large station, as well as in all kinds of factories, such as car, electronics, textile, medicine, tobacco, alternator, and precise instrument. 
 
3. Eurostars air handling unit , air handler range or series
-Horizontal ceiling ducted air handling unit
-Horizontal concealed air handling unit
-Vertical concealed air handling unit
-Vertical exposed air handling unit
-Combined Type air handing unit
-Jet Flow Type air handing unit


Air Handling Systems Galvanized Frame Fan Filter Unit
Air Handling Systems Galvanized Frame Fan Filter Unit
Air Handling Systems Galvanized Frame Fan Filter Unit
 
Frame
•Penta-post extra heavy gauge aluminum profiles and strong fiber-reinforced PE corner connection forming the structural  frame
• superior mechanical strength and rigidity to the unit frame and to prevent any buckling or deformation
• Thermal bridge free design, the profiles filled with polyurethane foam for insulation
• Anodizing surface treatment for profiles, corrosion-resistant
• Stainless steel frame available
Air Handling Systems Galvanized Frame Fan Filter Unit

 
Air Handling Systems Galvanized Frame Fan Filter Unit
Famous Brand Fan and Motor
• Fan selection based on the air flow and air static requirement  is done by fan selection software
• Direct driven/ belt driven, forward curve/ backward curve centrifugal fans, and EC fan is available for option
• Nicotra, Kruger, Deton, Yilida is offered as option
• Motor is TEFC type, class F insulation and IP54 or IP55 protection, energy saving and stable operation
• Mounted on an adjustable slide for belt tension adjustment
• Variable frequency drive (VFD) motor is available
• Siemens, ABB, WEG, TECO is offered as option

Product Parameters

Air Handling Systems Galvanized Frame Fan Filter Unit

RFPD/4H Series Return Air Condition (Z TYPE,J TYPE)
Model RFPD/4H Air Flow (m³/h) Rated cooling cap.   (KW) Rated heating cap.   (KW) Water Flow (m³/h) Water D.P. (kpa) ESP     (pa) Motor power  (KW) Dimension Weight (KG) Noise   dB(A) Water pipe   (DN) Drain pipe   (DN)
L W H
10 1000 5.1 10.2 0.88 4.2 60 0.25 850 600 520 56 57 32 25
15 1500 8.4 15.2 1.44 9 60 0.25 950 650 570 63 57 40 25
20 2000 11.7 21.4 2.01 10.8 60 0.25 1100 750 570 81 58 40 25
25 2500 14.7 25.4 2.53 17.6 90 0.37 1100 850 570 83 59 40 25
30 3000 17.9 31.5 3.08 32 150 0.55 1100 1000 570 102 60 40 25
40 4000 23.6 41.1 4.06 60 180 0.75 1100 1280 620 106 60 40 25
50 5000 28.6 51.3 4.92 40 200 0.45x2 1100 1500 620 132 61 40 25
60 6000 35 62 6.02 42 200 0.55X2 1100 1630 620 152 62 50 25
70 7000 41 71 7.05 56 250 0.75x2 1100 1730 680 210 63 50 25
80 8000 45.5 84.3 7.83 32 250 0.75X2 1100 1730 740 251 63 50 25
90 9000 53 92.5 9.12 36 250 0.75x2 1100 1830 740 282 65 50 25
105 10500 62.1 110 10.68 48 280 1.1x2 1200 2130 740 302 67 50 25
120 12000 71 133 12.21 62 280 1.1x2 1200 2130 840 307 67 50 25
135 13500 77 148 13.24 25.4 320 1.8x2 1200 2130 900 375 69 65 25
150 15000 86.5 153.5 14.88 26.4 320 2.2x2 1200 2130 970 386 70 65 25
NOTE: 1. Cooling conditions: inlet air DB27°C,WB19.5°C, inlet water temperature 7°C/12°C.
            2. Heating conditions: inlet air DB21°C, inlet water temperature 60°C/50°C.
   
RFPD/4X Series Fresh Air Condition  (Z TYPE;J TYPE)
Model RFPD/4X Air Flow (m³/h) Rated cooling cap.   (KW) Rated heating cap.   (KW) Water Flow (m³/h) Water D.P. (kpa) ESP     (pa) Motor power  (KW) Dimension Weight (KG) Noise   dB(A) Water pipe   (DN) Drain pipe   (DN)
L W H
10 1000 14 13.5 2.41 16.3 60 0.25 850 600 520 56 57 32 25
15 1500 20.2 19.8 3.47 34 60 0.25 950 650 570 63 57 40 25
20 2000 27 26.6 6.64 45 60 0.25 1100 750 570 81 58 40 25
25 2500 31 31.6 5.33 26 90 0.37 1100 850 570 83 59 40 25
30 3000 40 41.8 6.88 47 150 0.55 1100 1000 570 102 60 40 25
40 4000 50 52 8.6 31 180 0.75 1100 1280 620 106 60 40 25
50 5000 65 64 11.18 63 200 0.45x2 1100 1500 620 132 61 40 25
90 6000 73 74.2 12.56 12 200 0.55x2 1100 1630 620 152 62 50 25
70 7000 84 85.5 14.45 16 250 0.75x2 1100 1730 680 210 63 50 25
80 8000 101 102.2 17.37 14.5 250 0.75X2 1100 1730 740 251 63 50 25
90 9000 113 114.2 19.44 18.6 250 0.75x2 1100 1830 740 282 65 50 25
105 10500 135 136 23.22 29 280 1.1X2 1200 2130 740 302 67 50 25
120 12000 151 154 25.97 19.6 280 1.1X2 1200 2130 840 307 67 50 25
135 13500 166 179 28.55 16.3 320 1.8X2 1200 2130 900 375 69 65 25
150 15000 185 202 31.82 18.2 320 2.2x2 1200 2130 970 386 70 65 25
NOTE:1. Cooling conditions: inlet air DB27°C,WB19.5°C, inlet water temperature 7°C/12°C.
           2. Heating conditions: inlet air DB21°C, inlet water temperature 60°C/50°C.
 
    

Company Profile

 

1.Location: Dezhou city, Shandong province, near Beijing
2.Registered capital: $ 15 million
3.Employees: about
 1000 employees, including 500 workers for production, 22 product engineers and 38 technicians for design or service, 350 talents for administration, sales and installation, etc.
4.Certificate: ISO9001, ISO14001, CE, National First Class Certificate for design and installation.
5.Products: more than 30 series and more than 1000 models, including air / water chiller (with heat pumps), AHU, various fan coils, VRV, Rooftop unit, fans, valves, air conditioner for industry.
6.Covers an area of 300,000 square meters.

 

Air Handling Systems Galvanized Frame Fan Filter Unit

 

 

 

Air Handling Systems Galvanized Frame Fan Filter Unit

Air Handling Systems Galvanized Frame Fan Filter UnitAir Handling Systems Galvanized Frame Fan Filter Unit

 

Warranty&Payment

TIME OF DELIVERY : Within 25 days after receiving deposit
Support T/T , L/C, Alibaba

Warranty

One year from shipping date

After Sales Service

During the warranty period, machines which cannot run due to quality problems,Choose the following options.
1) During the one-year warranty period, non-human factors cause product quality problems, and provide parts replacement and repair and maintenance services.
2) In addition to the one-year warranty period, parts replacement and repair and maintenance services are provided at the user's expense.

Promotion Method

1) Pay the full amount in one lump sum, 1% discount.
2) Recommend other customers to buy and return a part of the commission. 

FAQ

Q1: Are you a manufacturer?
A1: Yes, we have more than 11 years in water chiller business. Ruidong Group Co.,Ltd is a central air conditioning product design,production,sale,installation in one of the modern large-scale enterprises.Group registered capital of 155.5 million yuan,covers an area of three hundred thousand square meters,construction area of one hundred and eighty thousand square meters. Group is located in the beautiful garden city in northwestern Shandong Dezhou.Welcome to visit us anytime!
Q2: Could you help us to recommend the model for our project?
A2: Yes, we have engineer to check the details and make the scheme for you. Based on the following: Cooling capacity / Refrigerant / Ambient temperature / Voltage / For what industry /The building drawing(if you have) / Any other special requirements. 
Q3: How to ensure your product with good quality?
A3: We use the well-know brand accessories, such as Hanbell, copeland, danfoss compressor, Emerson expansion Valve, Siemens controller. All chillers are factory tested under load conditions to ensure good quality and easy installation for users.
Q4:Pre-sales service
A4:
1.
Quick response within .

2. hours. Various communication methods, email, phone or chat APP (WeChat/WhatsApp/linkin, etc.) are available.
3. Full technical information in English or Russian.
4. For the end user, HAVC design and drawings for project are offered online or on site free of charge.
Q5: After-sales service and guarantee
A5:
1. Report the order tracking status regularly, and provide real-time photos or videos if necessary.
2.Provide online installation and commissioning technical guidance, if necessary, can provide paid on-site commissioning services.
3. After-sales guarantee: 13 months for the main engine and 37 months for the compressor.
During the warranty period, if any quality defects, the accessories will be sent by us free of charge against detailed
descriptions and necessary videos&photos. The labor costs incurred in replacing the accessories will be deducted from the next order.
4. Overseas installation and maintenance partners have been signed in countries, welcome to choose.

Q6: How can I place an order?
A6: Contact us via made in China.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

360° Virtual Tour

Diamond Member Since 2021

Suppliers with verified business licenses

Manufacturer/Factory
Registered Capital
22.98 Million USD
Plant Area
300000 square meters